GODRICH
#css-animation#button#loader#transition#scroll#dashboard#ui#design-trends

02Dependency Arrows That Turn at Right Angles from Each Task's End

The arrow leaves a task's end to the right and turns down, and when the next task does not start far enough past that turn it doubles back left through the gap between rows, while a dash pattern flows along the route's length.

Best forShared timeline page for a client project

ROUTE_STUBDASH_FLOW_SPEEDARROW_STAGGER_MS
Dependency Arrows That Turn at Right Angles from Each Task's End
Open in a new tab

02 Dependency Arrows That Turn at Right Angles from Each Task's End — Measured area 2.342% · moving frames 23/23Original by GODRICH · SCSS and React ship in the zip · Gantt Chart JavaScript: 9 Self-Scheduling Views

The post this demo lives in

Gantt Chart JavaScript: 9 Self-Scheduling Views - preview of all 9 demosGantt Chart JavaScript: 9 Self-Scheduling ViewsIn Gantt chart JavaScript, when a design draft slips three days, moving one bar makes the schedule lie. 04 pushes later See all demos in this post

If you like this effect - similar demos